{"id":12536,"date":"2026-08-17T16:38:35","date_gmt":"2026-08-17T14:38:35","guid":{"rendered":"https:\/\/www.lasagadesgares.be\/wordpress\/?p=12536"},"modified":"2026-08-17T16:39:33","modified_gmt":"2026-08-17T14:39:33","slug":"12536-2","status":"publish","type":"post","link":"https:\/\/www.lasagadesgares.be\/wordpress\/12536-2\/","title":{"rendered":"Mise en place du couloir sous voies: une \u00e9tape majeure dans la transformation de la gare d\u2019Ottignies"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">De ce samedi 15 jusqu\u2019au lundi 24 ao\u00fbt \u00e0 l\u2019aube, le trafic des trains est totalement interrompu entre les gares d\u2019Ottignies et de Fleurus. Les \u00e9quipes d\u2019Infrabel et de TUC RAIL proc\u00e8dent \u00e0 la mise en place de la structure en b\u00e9ton g\u00e9ante du futur couloir sous les voies. Il s\u2019agit d\u2019une \u00e9tape suppl\u00e9mentaire dans la transformation du site. Son ouverture au public est pr\u00e9vue d\u00e9but 2027 au plus tard.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Un ouvrage de 1.300 tonnes \u00e0 d\u00e9placer sur plus de 30 m\u00e8tres<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La pr\u00e9fabrication de la structure en b\u00e9ton du futur couloir a \u00e9t\u00e9 lanc\u00e9e au cours de l\u2019hiver dernier sur les lieux-m\u00eames compte tenu de ses mensurations imposantes : 9,2m de large, 5,6m de hauteur et 32m de longueur pour un poids d\u2019environ 1300tonnes. Cette phase n\u2019a eu aucun impact sur le trafic ferroviaire.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Au cours de ces 9 jours d\u2019interruption du trafic des trains, ce cadre en b\u00e9ton doit \u00eatre positionn\u00e9 \u00e0 son emplacement d\u00e9finitif, soit \u00e0 l\u2019endroit o\u00f9 se trouvait le passage \u00e0 niveau de l\u2019Avenue des Combattants ferm\u00e9 \u00e0 tout trafic d\u00e9but juillet (apr\u00e8s avoir \u00e9t\u00e9 interdit aux v\u00e9hicules et transform\u00e9 en d\u00e9pose-minute en septembre 2025). Depuis le 3 juillet dernier, les pi\u00e9tons empruntent la nouvelle passerelle de la gare d\u2019Ottignies pour rejoindre l\u2019ensemble des quais ou relier les quartiers des Villas et de Limelette.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les travaux de mise en place du couloir sous voies se d\u00e9roulent en plusieurs phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>le d\u00e9montage de 150 m\u00e8tres de voies et d\u2019\u00e9quipements de signalisation a \u00e9t\u00e9 lanc\u00e9 apr\u00e8s le passage du dernier train dans la nuit de vendredi \u00e0 samedi;d<\/li>\n\n\n\n<li>dans la foul\u00e9e, 3 grues de diff\u00e9rents gabarits ont commenc\u00e9 \u00e0 excaver environ 5.000 m\u00b3 de ballast et de terre afin d\u2019am\u00e9nager l\u2019espace destin\u00e9 \u00e0 accueillir le couloir;<\/li>\n\n\n\n<li>le 24 ao\u00fbt, le nouvel ouvrage doit \u00eatre d\u00e9plac\u00e9 (\u00e0 l\u2019aide de v\u00e9rins) sur une distance de 32 m\u00e8tres. La vitesse maximale de cette man\u0153uvre est de 4 \u00e0 5 m\u00e8tres \u00e0 l\u2019heure;<\/li>\n\n\n\n<li>ensuite, les \u00e9quipes techniques proc\u00e9deront au remblai, \u00e0 la pose des \u00e9quipements ferroviaires avant une phase de tests de s\u00e9curit\u00e9 pr\u00e9alables \u00e0 la remise en service des 2 voies pr\u00e9vue pour le lundi 24 ao\u00fbt \u00e0 l\u2019aube.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cette op\u00e9ration mobilise jusqu\u2019\u00e0 100 personnes et se d\u00e9roule 24h\/24. Ces travaux constituent une \u00e9tape de plus dans la transformation de la gare d\u2019Ottignies r\u00e9alis\u00e9e en partenariat avec la SNCB, la Province du Brabant wallon et le TEC.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Une esplanade de la taille d&rsquo;1,5 terrain de football<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Parall\u00e8lement \u00e0 la construction du couloir sous voies, ces derniers mois Infrabel et TUC RAIL ont construit un mur de sout\u00e8nement de 120m de long et d\u2019une hauteur de plus de 4,5m \u00e0 son point culminant. Il permettra de finaliser l\u2019am\u00e9nagement de la future esplanade de la gare au m\u00eame niveau que la base du couloir sous voies, soit 6m en de\u00e7\u00e0 de son niveau actuel. Cette place comportera un vaste espace pi\u00e9ton donnant acc\u00e8s aux nouvelles gares (trains et bus), des cheminements facilit\u00e9s (PMR), et une meilleure articulation entre trains, bus, v\u00e9los et d\u00e9pose-minute.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La surface totale de cette esplanade sera d&rsquo;environ 12.000 m\u00b2 soit l&rsquo;\u00e9quivalent de 1,5 terrain de football. <em>(Sources: SNCB\/Infrabel)<\/em><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lire l&rsquo;histoire de la gare d&rsquo;Ottignies<\/strong> <\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"400\" height=\"300\" data-id=\"12530\" src=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-8.webp\" alt=\"\" class=\"wp-image-12530\" srcset=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-8.webp 400w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-8-300x225.webp 300w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-8-1x1.webp 1w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"300\" height=\"400\" data-id=\"12532\" src=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-2.webp\" alt=\"\" class=\"wp-image-12532\" srcset=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-2.webp 300w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-2-225x300.webp 225w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-2-1x1.webp 1w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"400\" height=\"300\" data-id=\"12533\" src=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-3.webp\" alt=\"\" class=\"wp-image-12533\" srcset=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-3.webp 400w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-3-300x225.webp 300w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-3-1x1.webp 1w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"675\" data-id=\"12528\" src=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/Esplanade-Ottignies-projection.avif\" alt=\"\" class=\"wp-image-12528\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"198\" data-id=\"12527\" src=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-Projection-2.webp\" alt=\"\" class=\"wp-image-12527\" srcset=\"https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-Projection-2.webp 400w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-Projection-2-300x149.webp 300w, https:\/\/www.lasagadesgares.be\/wordpress\/wp-content\/uploads\/2025\/11\/CSV-Ottignies-Projection-2-1x1.webp 1w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>De ce samedi 15 jusqu\u2019au lundi 24 ao\u00fbt \u00e0 l\u2019aube, le trafic des trains est totalement interrompu entre les gares d\u2019Ottignies et de Fleurus. Les \u00e9quipes d\u2019Infrabel et de TUC RAIL proc\u00e8dent \u00e0 la mise en place de la structure en b\u00e9ton g\u00e9ante du futur couloir sous les voies. Il s\u2019agit d\u2019une \u00e9tape suppl\u00e9mentaire dans [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":12530,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[204],"tags":[],"class_list":["post-12536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/posts\/12536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/comments?post=12536"}],"version-history":[{"count":2,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/posts\/12536\/revisions"}],"predecessor-version":[{"id":12538,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/posts\/12536\/revisions\/12538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/media\/12530"}],"wp:attachment":[{"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/media?parent=12536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/categories?post=12536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lasagadesgares.be\/wordpress\/wp-json\/wp\/v2\/tags?post=12536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}